• Login
  • Register
    • Login
    • Register
  • About
  • Help
  • Browse
  • Search
  • Featured
  • Finding Aids

Filter by

object type
Maps
Plans
century
20th century
21st century
decade
1940s
1950s
1960s
1980s
1990s
2000s
year
1940
1941
1942
1943
1944
1945
1946
1947
1948
1949
1955
1956
1957
1958
1959
1960
1980
1982
1985
1986
1987
1989
1990
1991
1992
1993
1994
1995
1998
1999
2000
2002
2003
2004
2005
2006
and 29 more
person
Arbor Court
David Woodhouse Architects
George W. Barton and Associates
Harding Lawson Associates
Big Rock Visitor Station
Bowman, Barrett & Associates, Inc.
Steadfast Bridges
and 65 more
language
English
collection
The Morton Arboretum Records
Subject/Keyword
Administration Building
Aerial photography
Aerial Surveys
Arbor Court
Arbordale
Arboretum Bodies of Water
Arboretum Buildings and Stuctures
and 86 more

Objects (195 results)

Sort By: Identifier
  • Identifier
  • Title
  • Date
  • Rank
Sort Order: Ascending
  • Ascending
  • Descending
Recent Searches
View: list
  • images
  • list

North-South Tollway drainage plan, Contract CIP-615, McDonough Associates, Inc. (3.5857)


Creator: Illinois State Toll Highway Authority
Type: Map
Description:Sheets numbered DR-5--DR-7 and DR-14--DR-16. Shown in these drawings are the roadway plans for the North-South Tollway between Sta. 1152-1195 and Sta. 7558+30-7600+50; adjacent portions of the East-West Tollway are also included. The roadways are located along the south boundary of the Arboretum.
Extent: 6 sheets stapled

North-South Tollway [engineering drawings] Contract D6, McDonough Associates, Inc. (3.5858)


Creator: Illinois State Toll Highway Authority
Type: Map
Description:Sheets numbered 44-46, 51-54, 66-68, and 73. CONTENTS:--Roadway plans Sta. 1152-1195 and Sta. 7529-7585+50. --Roadway profiles Sta. 1155-2000.--Ramp NW profile Sta. 58-73+30.
Extent: 11 sheets stapled

North-South Tollway--East-West Tollway interchange. [Contractor] Envirodyne Engineers, Inc. (3.5859)

Date: May 1985
Creator: Illinois State Toll Highway Authority
Type: Map
Description:Drawings include roadway plans, sheets 1-3 and roadway profile drawings, sheets 4-12.
Extent: 12 sheets stapled

North-South Tollway interchange sketches [by] Envirodyne Engineers (3.5866)

Date: March 1 1986
Creator: Illinois State Toll Highway Authority
Type: Map
Description:Cover title. "Appendix B".
Extent: 1 volume (var paging)

North-South Tollway bridge sketches [by] Envirodyne Engineers (3.5867)

Date: March 1 1986
Creator: Illinois State Toll Highway Authority
Type: Map
Description:Cover title. "Appendix C". The vol. is stamped "Preliminary".
Extent: 1 volume (var paging)

North-South Tollway exhibits [by] Envirodyne Engineers (3.5868)

Date: March 1 1986
Creator: Illinois State Toll Highway Authority
Type: Map
Extent: 1 volume (var paging)

North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5869)

Date: February 9 1987
Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v.1, Roadway
Extent: 1 of 5 volumes

North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5870)

Date: February 24 1987
Creator: Illinois State Toll Highway Authority
Type: Map
Description:Contract requirements for Contract CIP-615, North-South Tollway roadway, bridge, tunnel, and ramp toll plaza construction.
Extent: 1 volume

North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5871)

Date: February 9 1987
Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v. 2, Specialties and standard drawings
Extent: 1 of 5 volumes

North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5872)

Date: February 9 1987
Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v.3, Cross-sections
Extent: 1 of 5 volumes

North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5873)

Date: February 9 1987
Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v.4, Structures
Extent: 1 of 5 volumes

North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5874)

Date: February 9 1987
Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v. 5, Warrenville Road bridge
Extent: 1 of 5 volumes

North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5875)

Date: February 12 1987
Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.1, Roadway plans
Extent: 1 of 5 volumes

North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5876)

Date: February 24 1987
Creator: Illinois State Toll Highway Authority
Type: Map
Description:[Contract requirements] North-South Tollway roadway and bridge construction, M.P. 20.70 to M.P. 22.28, Sta. 1190 to Sta. 1260.
Extent: 1 volume

North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5877)

Date: February 12 1987
Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.2, Cross-sections
Extent: 1 of 5 volumes

North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5878)

Date: February 12 1987
Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.3, Structures
Extent: 1 of 5 volumes

North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5879)

Date: February 12 1987
Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.4, Structures: steel girder alternate
Extent: 1 of 5 volumes

North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5880)

Date: February 12 1987
Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.5, Structures: concrete box alternate
Extent: 1 of 5 volumes

[Morton Arboretum undedrpass and ramp interchange with Route 53] (3.5881)

Date: 1957
Type: Map
Extent: 9 sheets stapled

Plans for proposed federal aid highway: F. A. Route 61, Sections 534X-R [and] 534X-RB, Project F-184 (20), DuPage County. [Prepared by George W. Barton & Associates, Inc.] (3.5886)

Date: March 12 1959
Creator: Illinois Division of Highways
Type: Map
Extent: 1 volume (68 sheets)

Plans for proposed federal aid highway: F. A. Route 61, Sections 534X-R [and] 534X-RB, Project F-184 (20), DuPage County. [Prepared by George W. Barton & Associates, Inc.] (3.5887)

Date: March 12 1959
Creator: Illinois Division of Highways
Type: Map
Description:Imperfect, full-scale preliminary version of the Plans (63x92 cm.) comprising 58 pages only.
Extent: 1 volume (58 sheets)

[State Route 53 profile (Sta. 01-00 to Sta. 49+15.48), an engineering drawing for the widening and improving of the roadway] (3.5888)

Date: circa 1957
Type: Map
Description:The Route 53 roadway extending from the East-West Tollway to the Valley View subdivision, showing re-routing of the road and the eastern branch of the DuPage River.
Extent: 2 sheets in binder

Illinois Route 53 and Park Boulevard intersection improvement; F. A .U. Route 2578 (Ill. Rte. 53) Section 534X-N (85), DuPage County; plans for proposed state bond issue highway. (3.5889)

Date: circa 1986
Creator: Illinois Division of Highways
Type: Map
Description:Imperfect copy: sheets 3-4 missing.
Extent: 24 sheets

Morton Arboretum: Illinois Route 53 paved shoulder addition (3.5890)

Date: April 1 1989
Creator: Ciorba Group, Inc.
Type: Map
Description:A proposal for adding turn lanes at the Arbordale/Research Center entrances off of Route 53; never developed.
Extent: 4 sheets

South Farm stormwater management facilities (3.5946)

Date: June 1990
Creator: Sheaffer and Roland, Inc.
Type: Map
Description:Revision of plans developed in April 1990.
Extent: 5 sheets in binder

Final engineering plans and specifications for the Morton Arboretum roadway improvement plans, phase I (3.5948)

Date: August 17 1990
Creator: Roake & Associates, Inc.
Type: Plan
Extent: 6 sheets in binder

Pavement and structure widths on Illinois Highway 53, vicinity of Morton Arboretum (3.6058)

Date: August 28 1956
Creator: George W. Barton and Associates
Type: Map
Extent: 1 sheet

Right-of-way plant, F.A. Route 61 (SBI Route 53), Section 534 X-R, DuPage County (3.6059)

Date: August 8 1957
Creator: George W. Barton and Associates
Type: Map
Extent: 1 sheet

Proposed geometrics, Route 53 (3.6061)

Date: May 1 1957
Creator: George W. Barton and Associates
Type: Map
Extent: 1 sheet

Morton Arboretum roadway pavement evaluation (3.6107)

Date: December 22 1986
Creator: Lindley & Sons, Inc.
Type: Map
Description:Includes a 1990 addition of potential permanent road section closures shaded red.
Extent: 2 sheets bound

Morton Arboretum roadway pavement evaluation (3.6108)

Date: December 22 1986
Creator: Lindley & Sons, Inc.
Type: Map
Description:Includes the Round Meadow Lane section.
Extent: 3 sheets

Morton Arboretum roadway pavement evaluation (3.6114)

Date: December 22 1986
Creator: Lindley & Sons, Inc.
Type: Map
Description:Includes Round Meadow Lane and culverts.
Extent: 3 sheets

Plans for proposed Federal Aid Highway FAU Route 2578 (IL 53)… DuPage County (3.6116)

Date: October 25 1992
Creator: Illinois Division of Highways
Type: Map
Extent: 69 sheets clipped together

The Morton Arboretum Thornhill Education Center (3.6242)

Date: 1993
Creator: Bauer Latoza Studio
Type: Plan
Description:Set includes construction plans (12/31/92) and updates in 1993 for Thornhill Building, Guide Center, Outpost, new water, sanitary and storm water, electrical, and telephone work.
Extent: 185 sheets, bound, with inserted loose sheets

The Morton Arboretum Thornhill Education Center (3.6243)

Date: August 5 1992
Creator: Bauer Latoza Studio
Type: Plan
Description:Bid document. Marked "Released to Map Room/ Not construction set." Includes Staging Center and Well House #2.
Extent: 169 sheets bound

The Morton Arboretum Thornhill Education Center (3.6244)

Date: March 2 1992
Creator: Bauer Latoza Studio
Type: Plan
Description:[Preliminary Thornhill Building design plans]
Extent: 43 sheets stapled

Next 36

© 2018 THE MORTON ARBORETUM  |  4100 ILLINOIS ROUTE 53, LISLE, IL 60532  |  Map  |  Phone: 630-968-0074  |   Subscribe   |  Email: trees@mortonarb.org  |  Privacy Policy