This object is either not yet digitized or not digitally available. To learn how to gain access, please contact the Sterling Morton Library at library@mortonarb.org or (630) 719-2429.
Main Entrance/Main Road, Phase 2, Overall Plan
3.44577
St. Charles, Illinois
Computer-aided designs
Not yet digitized
Original
92 cm W x 62 cm H (Item)
Page 1: 1 inch = 200 feet; Pages 2-3: 1 inch = 30 feet; Page 4: 1 inch = 50 feet; Page 5: N/A
5 Sheets
Map
November 21 2002
Includes planting plans for East Branch, DuPage River Detention Facility and Compensatory/Wetland Mitigation Storage Facility. Includes Planting Specifications.
Main Entrance/Main Road Phase Two Planting Specifications
East Branch, DuPage River Detention Facility Planting Plan
East Branch, DuPage River Detention Facility Planting Plan (Alternate #1)
Compensatory/Wetland Mitigation Storage Facility Planting Plan
East Branch, DuPage River Detention Facility Planting Plan
East Branch, DuPage River Detention Facility Planting Plan (Alternate #1)
Compensatory/Wetland Mitigation Storage Facility Planting Plan
Lisle, Illinois
English
This object is either not yet digitized or not digitally available. To learn how to gain access, please contact the Sterling Morton Library at library@mortonarb.org or (630) 719-2429.