Browsing by Subject/Keyword: Subject/Keyword:
Berm Landscape Plan - West Section and East Section [11/1992, additional handwritten notes] (3.32004)
Date: November 17 – 19 1992Creator: Tyznik, Anthony
Type: Plan
Description:West section is on sheets 1 and 2, east section on sheets 3-6.
Handwritten plant changes on plan.
Extent: 6 sheets bound and stapled
Proposed FT "A" [telephone] cable relocation. Preliminary (3.5843)
Date: April 24 1986Creator: AT&T Communications, Inc.
Type: Map
Description:Telephone cable relocation along the North-South Tollway on the southern and eastern boundaries of the Arboretum.
Extent: 2 sheets stapled
F. A. Route 61 (Ill. Route 53 expressway): Will County Section 99-1 & 99-2; Cook County Section 16-1; DuPage County Section 22-1 (3.5845)
Date: 1963Creator: A. Benesch & Co.
Type: Map
Description:"Key plan" An early proposal for the North-South Tollway.
Extent: 1 sheet
Intersection design study: F. A. P. route 431 (Ill. Rte. 53 freeway) with U.S. Route 34 (Ogden Ave.) Sec. no. 22-2, DuPage County. Preliminary. (3.5846)
Date: circa 1965Creator: Tornrose, Campbell, & Assoc.
Type: Map
Description:"Preliminary print, Illinois Division of Highways, Mobility Studies Unit, subject to revisions" stamped on map. An early proposal for the North-South Tollway.
Extent: 1 sheet
North-South Tollway--East-West Tollway interchange. [Contractor] Envirodyne Engineers, Inc. (3.5859)
Date: May 1985Creator: Illinois State Toll Highway Authority
Type: Map
Description:Drawings include roadway plans, sheets 1-3 and roadway profile drawings, sheets 4-12.
Extent: 12 sheets stapled
North-South Tollway preliminary alignment (Ogden Avenue-Butterfield Road. Contractor) Envirodyne Engineers, Inc. (3.5860)
Date: February 21 1985Creator: Illinois State Toll Highway Authority
Type: Map
Description:Aerial survey with the preliminary alignment of the North-South Tollway with the East-West Tollway drawn in.
Extent: 2 sheets stapled
North-South Tollway preliminary plans [by] Envirodyne Engineers. Aerial photography by Aero-metric Engineering, Inc., photogrammetric engineers. (3.5861)
Date: March 1 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:Sheets numbered: "Drawing 1[-12] of 12," aerial photographs on which the roadway has been drawn in. Sheets 3, 5, 7, 9, and 11 are accompanied by roadway profiles numbered 3a, 5a, 7a, 9a, and 11a. Cover title. "Appendix A". Aerial survey made in November 1984.
Extent: 18 sheets
North-South Tollway plan: Section D-7a, Sta. 1180 to Sta. 1260 [by] PRC Consoer Townsend, design section engineer (3.5864)
Date: June 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:Sheets are stamped: "Preliminary plans, subject to revision".
Extent: 7 sheets stapled
A Landscape Development Plan for the Tollway Berm, West and East Sections, The Morton Arboretum [10/1992] (3.6529)
Date: October 1992Creator: Tyznik, Anthony
Type: Plan
Extent: 2 sheets
A Landscape Development Plan for the Tollway Berm, West and East Sections, The Morton Arboretum [10/1992, colored, including pencil modifications] (3.6530)
Date: October 1992Creator: Tyznik, Anthony
Type: Plan
Description:Partially colored with colored pencil and includes pencil corrections.
Extent: 2 sheets
Berm Plan - West Section and East Section [11/1992] (3.6537)
Date: November 17 – 19 1992Creator: Tyznik, Anthony
Type: Plan
Description:West section is on sheets 1 and 2, east section on sheets 3-6.
Extent: 6 sheets
Berm Plan - West Section and East Section [03/1993, latest version] (3.6538)
Date: March 16 1993Creator: Tyznik, Anthony
Type: Plan
Description:West section is on sheets 1 and 2, east section on sheets 3-6.
Includes note: "copy with Bachtell's amendments, latest version March 16, 1993."
Missing sheet 6.
Extent: 5 sheets
[North-South Tollway early proposal, including Ogden Ave. interchange, route along Arboretum east and south boundaries] (3.6780)
Date: circa 1965Type: Map
Description:Stamped "Preliminary" Note on back: "Alternate Rte. 53" "Rte. 53 New"
Extent: 1 sheet