Plat of Survey of Part of the Southeast 1/4 of Section 34 & the Southwest 1/4 of Section 35, Township 39 North, Range 10, East of the Third Principal Meridian, in DuPage County, Illinois. (3.33785)
Date: October 8 1992Creator: Roake & Associates, Inc.
Type: Map
Extent: 1 sheet
Final Engineering Plans and Specifications for The Morton Arboretum Thornhill Conference Center Site Improvements, Area Wide Sanitary Sewer and Watermain Improvements, 1992 (3.33824)
Date: June 14 1994Creator: Roake & Associates, Inc.
Type: Plan
Extent: 27 sheets
Plat of Survey Morton Arboretum Agreement Line (3.35378)
Date: February 11 1992Creator: Roake & Associates, Inc.
Type: Map
Extent: 1 sheet
Plat of Survey of the Morton Arboretum (3.47242)
Date: June 30 2000Creator: Roake & Associates, Inc.
Type: Map
Description:"Being parts of sections 33, 34, 35 and 36, Township 39 North range 10 East, and parts of sections 1, 2, 3, and 4, Township 38 North range 10 East of the third principal meridian in DuPage County, IL"
Hand-drawn circled area with handwritten note "Project site" on first page.
Extent: 2 Sheets
Plat of Survey of the Morton Arboretum (3.47506)
Date: June 30 2000Type: Map
Description:"Being parts of sections 33, 34, 35 and 36, Township 39 North range 10 East, and parts of sections 1, 2, 3, and 4, Township 38 North range 10 East of the third principal meridian in DuPage County, IL"
Hand-drawn circled area with handwritten note "Project site" on first page.
Extent: 2 Sheets
Site Improvement Plans for Equipment Storage Building (3.47511)
Date: February 13 2003Creator: Christopher B. Burke, Engineering West, Ltd.
Type: Plan
Description:"Project No. 00-927E"
Index:
Title Sheet
Existing Conditions
Geometric Plan
Grading & Drainage Plan
Utility Plan
Details
Specifications
Existing water atlas map (by Roake & Associates) provided for reference.
Extent: 9 Sheets
Final Engineering Plans and Specifications for The Morton Arboretum Roadway Improvement Plans, Phase I (3.5948)
Date: August 17 1990Creator: Roake & Associates, Inc.
Type: Plan
Description:Copy 2 is missing page 3.
Extent: 6 sheets in binder
Plat of Survey, Morton Arboretum [Hidden Lake] Agreement Line [with the Forest Preserve District of DuPage County] (3.6111)
Date: May 26 1992Creator: Roake & Associates, Inc.
Type: Map
Extent: 1 sheet
Final engineering plans and specifications for the Morton Arboretum roadway improvement plans, phase I (3.6231)
Date: August 17 1990Creator: Roake & Associates, Inc.
Type: Plan
Extent: 6 sheets in binder
Final Engineering Plans and Specifications for The Morton Arboretum Thornhill Conference Center Site Improvements - Area Wide Sanitary Sewer and Watermain Improvements (3.6250)
Date: June 14 1994Creator: Roake & Associates, Inc.
Type: Plan
Description:Record drawing
Revision of copy 3
Extent: 27 sheets, clipped together
Final Engineering Plans and Specifications for The Morton Arboretum Thornhill Conference Center Site Improvements - Area Wide Sanitary Sewer and Watermain Improvements (3.6251)
Date: May 19 1993Creator: Roake & Associates, Inc.
Type: Plan
Description:Revision of copy 3
Extent: 27 sheets
Final Engineering Plans and Specifications for The Morton Arboretum Thornhill Conference Center Site Improvements - Area Wide Sanitary Sewer and Watermain Improvements (3.6252)
Date: March 31 1993Creator: Roake & Associates, Inc.
Type: Plan
Extent: 27 sheets
Final engineering plans and specifications for the Morton Arboretum roadway improvement plans, phase I (3.6290)
Date: August 17 1990Creator: Roake & Associates, Inc.
Type: Map
Extent: 6 sheets in binder
Morton Arboretum plumbing plan (3.7105)
Date: March 24 1994Creator: Roake & Associates, Inc.
Type: Plan
Description:Irrigation system pumphouse modifications
Extent: 1 sheet
Morton Arboretum Irrigation System Modification at Firefly Pond (3.7108)
Date: March 24 1994Creator: Roake & Associates, Inc.
Type: Map
Extent: 1 sheet
Thornhill Center Overall Utility Plan (3.81458)
Date: June 22 1992Type: Plan
Description:A digital copy of the Thornhill Center Overall Utility Plan. A physical copy of this plan is not currently available.
Extent: 1 sheet
Thornhill Center Overall Grading Plan (3.81460)
Date: June 22 1992Type: Plan
Description:A digital copy of the Thornhill Center Overall Grading Plan. A physical copy of this plan is not currently available.
Extent: 1 sheet
Thornhill Center Detailed Grading and Utility Plan (3.81461)
Date: June 22 1992Type: Plan
Description:A digital version of the Thornhill Center Detailed Grading and Utility Plan. There is not a physical copy of this plan currently available.
Extent: 2 sheets
Plat of Survey of The Morton Arboretum (3.83091)
Date: June 30 2000Creator: Roake & Associates, Inc.
Type: Map
Description:Plat of Survey of The Morton Arboretum being parts of Sections 33, 34, 35 and 36, Township 39 North Range 10 East, and parts of sections 1, 2, 3, and 4, Township 38 North Range 10 East of the Third Principal Meridian in DuPage County, Illinois.
Includes handwritten markings that read, "Approx. location of proposed pre-fab chemical storage/rinse facility."
Extent: 2 sheets
Thornhill Center Detailed Grading and Utility Plan (3.92003)
Date: September 8 1992Creator: Bauer Latoza Studio, Roake & Associates, Inc.
Type: Plan
Description:Sheet C-10A of C-26 from the Thornhill Center Detailed Grading and Utility Plan, showing the area around the Outpost.
Extent: 1 sheet