Proposed Construction Concept Plan - Meadow Lake Outfall System Repair Section (3.113611)
Date: August 4 2005Creator: Huddleston-McBride Co.
Type: Plan
Extent: 1 sheet
Meadow Lake Outfall Repair (3.40095)
Creator: Huddleston-McBride Co.
Type: Plan
Description:Proposed construction concept plan for Meadow Lake outfall repair.
Subsurface Drain Tile Construction Plan for The Morton Arboretum (3.6353)
Date: February 26 1991Creator: Huddleston-McBride Co.
Type: Map
Description:Sheet 1 includes trench section for water table control and curtian drain mainline. Marked "Preliminary Plan." Sheet 2 is dated 7/27: "Drainage swale to topography and pipeline cross-sections along north edge of tollway berm: Centennial Grove to crabapples."
Extent: 2 sheets
Subsurface Drain Tile Construction Plan for The Morton Arboretum (3.6791)
Date: February 26 1991Creator: Huddleston-McBride Co.
Type: Map
Description:Sheet 1 includes trench section for water table control and curtian drain mainline. Marked "Preliminary Plan." Sheet 2 is dated 7/29: "Drainage swale to topography and pipeline cross-sections along north edge of tollway berm: Centennial Grove to crabapples."
Extent: 2 sheets