Browsing by Subject/Keyword: year:
Site Improvement Plans for The Morton Arboretum North Berm (3.31953)
Date: November 10 2003Creator: Christopher B. Burke, Engineering West, Ltd.
Type: Plan
Description:Includes overall plan, existing conditions,demolition and tree protection plan, stormwater pollution prevention, soil erosion & sediment control, and grading & drainage plan.
Extent: 11 stapled sheets
Arbor Court & Maze Garden Site Improvements Construction Set (3.31988)
Date: May 27 2003Creator: Hitchcock Design Group, EDAW
Type: Plan
Description:Includes Existing Conditions Plan, Site Preparation Plan, Grading Plan, Grading Plan Enlargement, Drainage Plan, Drainage Plan Enlargement, Materials Plan, Materials Plan Enlargement, Layout Plan, Layout Plan Enlargement, Overstory Planting Plan, Understory Planting Plan, Maze Garden Planting Plan, Planting Materials List, Wall Elevations, Site Details, Structural Details, Electrical Symbols, Arbor Court Electrical Plan, Electrical Details, Electrical Schedules, Irrigation Plan, Irrigation Plan Enlargement, and Irrigation Details
Extent: 42 sheets
Site Improvements Plans for The Morton Arboretum P-19 Expansion Parking (3.44584)
Date: March 7 2003Creator: Christopher B. Burke, Engineering West, Ltd.
Type: Plan
Description:Index
Title Sheet
Overall Plan
Existing Conditions
Demolition and Construction Preparation
Stormwater Pollution Prevention
Soil Erosion and Sedimentation Control
Soil Erosion and Sedimentation Control - Detention Basin
Grading and Drainage
Detention Basin Modification
Details
Specifications
Planting Plan
Overall Plan
Existing Conditions
Demolition and Construction Preparation
Stormwater Pollution Prevention
Soil Erosion and Sedimentation Control
Soil Erosion and Sedimentation Control - Detention Basin
Grading and Drainage
Detention Basin Modification
Details
Specifications
Planting Plan
Extent: 12 Sheets