Arbor Court & Maze Garden Permit Review/Construction (3.31986)
Date: June 9 2003Creator: Hitchcock Design Group
Type: Plan
Description:Arbor Court Electrical Plan
Extent: 1 sheet
Arbor Court & Maze Garden Permit Review/Construction (3.31987)
Date: March 7 2003Creator: Hitchcock Design Group
Type: Plan
Description:Includes: Arbor Court Electrical Plan, Electrical Details, Lighting Control Electrical Details, Installation Details, Electrical Schedules.
Extent: 6 sheets
Arbor Court & Maze Garden Site Improvements Construction Set (3.31988)
Date: May 27 2003Creator: Hitchcock Design Group, EDAW
Type: Plan
Description:Includes Existing Conditions Plan, Site Preparation Plan, Grading Plan, Grading Plan Enlargement, Drainage Plan, Drainage Plan Enlargement, Materials Plan, Materials Plan Enlargement, Layout Plan, Layout Plan Enlargement, Overstory Planting Plan, Understory Planting Plan, Maze Garden Planting Plan, Planting Materials List, Wall Elevations, Site Details, Structural Details, Electrical Symbols, Arbor Court Electrical Plan, Electrical Details, Electrical Schedules, Irrigation Plan, Irrigation Plan Enlargement, and Irrigation Details
Extent: 42 sheets
Maze Garden Enlarged Electrical Plan (3.40160)
Date: November 15 2002Creator: Hitchcock Design Group
Type: Plan
Description:90% Review Set (Not for Construction)
Extent: 1 sheet
Arbor Court Electrical Plan (3.40161)
Date: November 15 2002Creator: Hitchcock Design Group
Type: Plan
Description:90% Review Set (Not for Construction)
Extent: 1 sheet
Arbordale Utility Infrastructure Study, Exhibit 6, Proposed Utility Systems (3.47247)
Creator: Patrick Engineering, Inc.
Type: Plan
Description:Plans showing building structure, existing, and proposed utility lines, including water, sanitary, electric, gas, storm, and telecom.
Extent: 1 Sheet
Utility Infrastructure Study Single Line Diagram (Draft) (3.47252)
Date: October 31 2000Creator: Patrick Engineering, Inc.
Type: Plan
Description:Pumphouse #2, Thornhill Shelter, Thornhill Center, Thornhill & Park, Visitor Center, R/O Wastewater Treatment, Lift STA Underpass, Wellhouse #4, Admin. BLDG, Research BLDG, Arbordale Wastewater, Wellhouse #3, Lift STA W'ville RD.
Extent: 1 Sheet
Utility Infrastructure Study Single Line Diagram (3.47253)
Date: October 31 2000Creator: Patrick Engineering, Inc.
Type: Plan
Description:Pumphouse #2, Thornhill Shelter, Thornhill Center, Thornhill & Park, Visitor Center, R/O Wastewater Treatment, Lift STA Underpass, Wellhouse #4, Admin. BLDG, Research BLDG, Arbordale Wastewater, Wellhouse #3, Lift STA W'ville RD.
Contains circled areas.
Extent: 1 Sheet
South Farm Maintenance Center, Plant Production Area; Expansion Concept (3.7047)
Date: June 26 1999Creator: Mehaffey, Scott A.
Type: Plan
Extent: 1 sheet