Vehicular Bridge 14' x 26' [Sterling Pond] (3.47510)
Date: May 17 2002Creator: Steadfast Bridges, Steadfast Bridges
Type: Plan
Description:Built 2002
Stamped "Appproval Only."
Extent: 3 sheets
Vehicular Bridge 14' x 26' [Sterling Pond] (3.7083)
Date: August 9 2002Creator: Steadfast Bridges
Type: Plan
Description:Built 2002
Stamped "Field Use."
Extent: 3 sheets
Sterling Pond Bridge Replacement (3.7104)
Date: October 28 2002Creator: Christopher B. Burke, Engineering West, Ltd.
Type: Plan
Description:As-built. Includes May 17, 2002 Steadfast Bridges plan (three sheets). See STRU:L II (d) 2 for Steadfast Bridges plan (three sheets).
Extent: 7 sheets stapled