Browsing by people, organizations and landmarks: object type:
Sterling Pond Dam Reconstruction: Alternative New Dam Layout and Grading Plan (3.47218)
Date: July 2002Creator: Montgomery Watson Harza (MWH)
Type: Plan
Description:Plan of new dam layout with topographic map of Sterling Pond area.
Topographic map provided by Christopher B.Burke Engineering, LTD. (2002)
Extent: 1 Sheet
Sterling Pond Dam Reconstruction: Alternative New Dam Layout and Grading Plan (3.47219)
Date: April 2002Creator: Montgomery Watson Harza (MWH)
Type: Plan
Description:Plan of new dam layout with topographic map of Sterling Pond area.
Topographic map provided by Christopher B.Burke Engineering, LTD. (2002).
Handwritten numbers and equations.
Extent: 1 Sheet
Sterling Pond Dam Reconstruction: New Dam Layout and Grading Plan (3.47220)
Date: April 2002Creator: Montgomery Watson Harza (MWH)
Type: Plan
Description:Plan of new dam layout with topographic map of Sterling Pond area.
Topographic map provided by Christopher B.Burke Engineering, LTD. (2002).
Extent: 1 Sheet
Sterling Pond Bridge Replacement (3.47243)
Date: August 8 2002Creator: Christopher B. Burke, Engineering West, Ltd.
Type: Plan
Description:Plans and topographical surveys for the Sterling Pond bridge replacement in 2002.
"Issued for Permit"
"Project No. 02-273"
Each page is stamped and signed by the DuPage County Dept. of Development & Stormwater, Stormwater Management Division. (Oct 07 2002)
Index:
S-1 Site plan and general notes
S-2 Existing bridge plan and details
S-3 Pre-Engineered bridge plan and details
Appendix A1 For information purposes only
Appendix A2 For information purposes only
Appendix A3 For information purposes only
Copy 2 lacks the certification stamps.
Extent: 7 Sheets
Sterling Pond Bridge Replacement (3.47244)
Creator: Christopher B. Burke, Engineering West, Ltd.
Type: Plan
Description:Plans and topographical surveys for the Sterling Pond bridge replacement in 2002.
"Issued for Permit"
"Project No. 02-273"
Index:
S-1 Site plan and general notes
S-2 Existing bridge plan and details
S-3 Pre-Engineered bridge plan and details
Appendix A1 For information purposes only
Appendix A2 For information purposes only
Appendix A3 For information purposes only
Extent: 7 Sheets
Sterling Pond Bridge Replacement (3.47245)
Date: July 23 2002Creator: Christopher B. Burke, Engineering West, Ltd.
Type: Plan
Description:Plans and topographical surveys for the Sterling Pond bridge replacement in 2002.
"Issued for Bid"
"Project No. 02-273"
Index:
S-1 Site plan and general notes
S-2 Existing bridge plan and details
S-3 Pre-Engineered bridge plan and details
Appendix A1 For information purposes only
Appendix A2 For information purposes only
Appendix A3 For information purposes only
Extent: 7 Sheets
A Construction Plan for the Sterling Pond Bridge, The Morton Arboretum, Lisle, Illinois (3.5602)
Date: circa 1970Creator: Tyznik, Anthony
Type: Plan
Description:Bridge not constructed according to this plan.
Extent: 1 sheet
A construction plan for the Sterling Pond bridge, the Morton Arboretum, Lisle, Illinois Illinois (3.5603)
Date: circa 1970Creator: Tyznik, Anthony
Type: Plan
Description:Bridge not constructed according to this plan.
Extent: 1 sheet
Sterling Pond Bridge Replacement (3.7104)
Date: October 28 2002Creator: Christopher B. Burke, Engineering West, Ltd.
Type: Plan
Description:As-built. Includes May 17, 2002 Steadfast Bridges plan (three sheets). See STRU:L II (d) 2 for Steadfast Bridges plan (three sheets).
Extent: 7 sheets stapled