Browsing by people, organizations and landmarks: object type:
Northern Illinois Toll Highway Parcel No. E-2-23, Morton Arboretum, Section 2 & 3, T. 38N., R.10E. of the 3rd P.M., DuPage County, Illinios (3.5378)
Date: November 1 1956Creator: Illinois State Toll Highway Authority
Type: Map
Description:Area surveyed, 24.679 acres, shows interchange of East-West Tollway and Route 53. Includes notes in colored pencil.
Extent: 1 sheet
Milton Township Proposed Zoning (3.5379)
Date: August 1956Creator: Illinois State Toll Highway Authority
Type: Map
Description:Flood crest elevations of the Oct.1954 flood are given.
Extent: 1 sheet
Northern Illinois Toll Highway Parcel No. E-2-25, Morton Arboretum, Section 1 & 2, T.38N., R. 10E. of the 3rd P.M., DuPage County, Illinois (3.5381)
Date: January 24 1957Creator: Illinois State Toll Highway Authority
Type: Map
Description:Shows four tracts of Arboretum land, comprising 39.53 acres, surveyed for the East-West Tollway and Finley Road.
Extent: 1 sheet
Northern Illinois Toll Highway Parcel No. E-2-25, Morton Arboretum, Section 1&2, T.38N., R. 10E. of the 3rd P.M., DuPage County, Illinois (3.5382)
Date: January 24 1957Creator: Illinois State Toll Highway Authority
Type: Map
Description:Shows four tracts of Arboretum land, comprising 39.53 acres, surveyed for the East-West Tollway and Finley Road. Areas are outlined in colored pencil.
Extent: 1 sheet
Plat of Survey, North-South Tollway, Parcel NS-06-002.1 (3.5404)
Date: May 12 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:"Property shown… in Section 1, Township 38 north, range 10 east of the third principal meridian, DuPage County, Illinois."
Extent: 1 sheet
Hidden Lake Forest Preserve [site survey, ecological reconstruction, ecosystems/ecological value, slope, hydrology, soils, minerals, cultural improvements, and neighboring land use] (3.5833)
Date: circa 1975Creator: Forest Preserve District of DuPage County
Type: Map
Description:Subtitle above is summary of sheet-titles. A portion of this land parcel is leased by the Arboretum as a part of the Illinois State Toll Highway agreement of 1985. For a representation of the area leased, see DuPage County. Forest Preserve District. Hidden Lake Forest Preserve ... Arboretum-Forest Preserve District cooperative research program space study (SURV:B VI (c) 1).
Extent: 9 sheets stapled
Hidden Lake Forest Preserve: proposed site & grading plan (3.5835)
Date: July 1 1983Creator: Ralph F. Gross & Son Associates, Inc.
Type: Map
Description:A portion of the Forest Preserve land parcel is leased by the Arboretum as a part of the Illinois State Toll Highway agreement of 1985. For a representation of the area leased, see DuPage County. Forest Preserve District. Hidden Lake Forest Preserve ... Arboretum-Forest Preserve District cooperative research program space study (SURV:B VI (c) 1).
Extent: 1 sheet
North-South Tollway drainage plan, Contract CIP-615, McDonough Associates, Inc. (3.5857)
Creator: Illinois State Toll Highway Authority
Type: Map
Description:Sheets numbered DR-5--DR-7 and DR-14--DR-16. Shown in these drawings are the roadway plans for the North-South Tollway between Sta. 1152-1195 and Sta. 7558+30-7600+50; adjacent portions of the East-West Tollway are also included. The roadways are located along the south boundary of the Arboretum.
Extent: 6 sheets stapled
North-South Tollway [engineering drawings] Contract D6, McDonough Associates, Inc. (3.5858)
Creator: Illinois State Toll Highway Authority
Type: Map
Description:Sheets numbered 44-46, 51-54, 66-68, and 73. CONTENTS:--Roadway plans Sta. 1152-1195 and Sta. 7529-7585+50. --Roadway profiles Sta. 1155-2000.--Ramp NW profile Sta. 58-73+30.
Extent: 11 sheets stapled
North-South Tollway--East-West Tollway interchange. [Contractor] Envirodyne Engineers, Inc. (3.5859)
Date: May 1985Creator: Illinois State Toll Highway Authority
Type: Map
Description:Drawings include roadway plans, sheets 1-3 and roadway profile drawings, sheets 4-12.
Extent: 12 sheets stapled
North-South Tollway preliminary alignment (Ogden Avenue-Butterfield Road. Contractor) Envirodyne Engineers, Inc. (3.5860)
Date: February 21 1985Creator: Illinois State Toll Highway Authority
Type: Map
Description:Aerial survey with the preliminary alignment of the North-South Tollway with the East-West Tollway drawn in.
Extent: 2 sheets stapled
North-South Tollway preliminary plans [by] Envirodyne Engineers. Aerial photography by Aero-metric Engineering, Inc., photogrammetric engineers. (3.5861)
Date: March 1 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:Sheets numbered: "Drawing 1[-12] of 12," aerial photographs on which the roadway has been drawn in. Sheets 3, 5, 7, 9, and 11 are accompanied by roadway profiles numbered 3a, 5a, 7a, 9a, and 11a. Cover title. "Appendix A". Aerial survey made in November 1984.
Extent: 18 sheets
[Topographic map of the southern boundary area of the Arboretum showing the North-South Tollway right-of-way] (3.5862)
Date: October 1985Creator: Illinois State Toll Highway Authority
Type: Map
Extent: 10 sheets stapled
Morton Arboretum berm, plan and profile, Sta. 1157 to Sta. 1193. [Contractor] Vollmer Associates, consulting engineers (3.5863)
Date: May 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:A preliminary proposal. For the topographic configuration of the berm actually developed see Tyznik, Anthony. A berm detail… (SURV:A III (c) 1).
Extent: 4 sheets stapled
North-South Tollway plan: Section D-7a, Sta. 1180 to Sta. 1260 [by] PRC Consoer Townsend, design section engineer (3.5864)
Date: June 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:Sheets are stamped: "Preliminary plans, subject to revision".
Extent: 7 sheets stapled
Existing and proposed watersheds, North-South Tollway plan (3.5865)
Date: March 1 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:The principal title above appears in ms. added to drawing 6 in the State Toll Highway Authority's aerial survey on which the plan for the North-South Tollway was drawn in (See BOUND:C III (c) 1). Watershed features are also drawn in in this work which appears in 3 sheets labelled in ms.: drawing no. 88-89, and 91.
Extent: 3 sheets stapled
North-South Tollway interchange sketches [by] Envirodyne Engineers (3.5866)
Date: March 1 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:Cover title. "Appendix B".
Extent: 1 volume (var paging)
North-South Tollway bridge sketches [by] Envirodyne Engineers (3.5867)
Date: March 1 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:Cover title. "Appendix C". The vol. is stamped "Preliminary".
Extent: 1 volume (var paging)
North-South Tollway exhibits [by] Envirodyne Engineers (3.5868)
Date: March 1 1986Creator: Illinois State Toll Highway Authority
Type: Map
Extent: 1 volume (var paging)
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5869)
Date: February 9 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v.1, Roadway
Extent: 1 of 5 volumes
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5870)
Date: February 24 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:Contract requirements for Contract CIP-615, North-South Tollway roadway, bridge, tunnel, and ramp toll plaza construction.
Extent: 1 volume
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5871)
Date: February 9 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v. 2, Specialties and standard drawings
Extent: 1 of 5 volumes
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5872)
Date: February 9 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v.3, Cross-sections
Extent: 1 of 5 volumes
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5873)
Date: February 9 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v.4, Structures
Extent: 1 of 5 volumes
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5874)
Date: February 9 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v. 5, Warrenville Road bridge
Extent: 1 of 5 volumes
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5875)
Date: February 12 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.1, Roadway plans
Extent: 1 of 5 volumes
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5876)
Date: February 24 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:[Contract requirements] North-South Tollway roadway and bridge construction, M.P. 20.70 to M.P. 22.28, Sta. 1190 to Sta. 1260.
Extent: 1 volume
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5877)
Date: February 12 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.2, Cross-sections
Extent: 1 of 5 volumes
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5878)
Date: February 12 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.3, Structures
Extent: 1 of 5 volumes
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5879)
Date: February 12 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.4, Structures: steel girder alternate
Extent: 1 of 5 volumes
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5880)
Date: February 12 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.5, Structures: concrete box alternate
Extent: 1 of 5 volumes
Northern Illinois Toll Highway: east-west route, plan & profile, Sta. 7520 to [Sta. 7637] Contract E-2A, Hurst-Rosche, Inc. (3.5884)
Date: 1957Creator: Illinois State Toll Highway Authority
Type: Map
Description:Sheets have the following numbering sequences: printed, "Sheet 15[-23] of 70"; stamped, 8265-8273; and in ms., 15-23.
Extent: 9 sheets stapled
Northern Illinois Toll Highway Parcel No. E-2-70, Sec. 3, T.38N., R.10E. of the 3rd P.M., DuPage County, Illinois (3.6092)
Date: 1956Creator: Illinois State Toll Highway Authority
Type: Map
Description:This map is a portion along the East-West Tollway easement in Lot 7 of Petersen-Tate Assessment Plat no. 2. This copy (Copy 2), dated from about 1956, includes surveyed area of 0.583 acres of the permanent easement.
Extent: 1 sheet
Northern Illinois Toll Highway Parcel No. E-2-68E [and E-2-68E.1], Sec. 3, T.38N., R.10E. of the 3rd P.M., DuPage County, Illinois (3.6093)
Date: May 1978Creator: Illinois State Toll Highway Authority
Type: Map
Description:Area surveyed, 0.313 acres, is a portion along the East-West Tollway easement in Lot 6 of Petersen-Tate Assessment Plat no. 2.
Extent: 3 sheets
Northern Illinois Toll Highway Parcel no. E-2-70E, Sec. 3, T.38N., R.10E. of the 3rd P.M., DuPage County, Illinois (3.6094)
Date: May 1978Creator: Illinois State Toll Highway Authority
Type: Map
Description:Area surveyed, 0.295 acres, is a portion along the East-West Tollway easement in Lot 7 of Petersen-Tate Assessment Plat no. 2.
Extent: 2 sheets
Northern Illinois Toll Highway Parcel No. E-2-71E [and] E-2-71E.1, Sec. 3, T.38N., R.10E. of the 3rd P.M., DuPage County, Illinois (3.6095)
Date: May 1978Creator: Illinois State Toll Highway Authority
Type: Map
Description:Area surveyed, 0.206 acres, is a portion along the East-West Tollway easement in Lot 6 of Petersen-Tate Assessment Plat no. 2.
Extent: 4 sheets