Browsing by Subject/Keyword: object type:
Prairie Visitor Station: Trail Development (3.40111)
Date: April 5 2004Creator: Pelkonen, Peggy
Type: Plan
Description:Trail development plan fro Prairie Visitor Station drawn over aerial photograph showing Sterling Pond, Acre Trail, Main Trail Loop 4, Savanna Trail, and Prairie Trail with trails mapped and named, located near Leask Lane.
Extent: 1 sheet
Sterling Pond Dam Reconstruction: Alternative New Dam Layout and Grading Plan (3.47218)
Date: July 2002Creator: Montgomery Watson Harza (MWH)
Type: Plan
Description:Plan of new dam layout with topographic map of Sterling Pond area.
Topographic map provided by Christopher B.Burke Engineering, LTD. (2002)
Extent: 1 Sheet
Sterling Pond Dam Reconstruction: Alternative New Dam Layout and Grading Plan (3.47219)
Date: April 2002Creator: Montgomery Watson Harza (MWH)
Type: Plan
Description:Plan of new dam layout with topographic map of Sterling Pond area.
Topographic map provided by Christopher B.Burke Engineering, LTD. (2002).
Handwritten numbers and equations.
Extent: 1 Sheet
Sterling Pond Dam Reconstruction: New Dam Layout and Grading Plan (3.47220)
Date: April 2002Creator: Montgomery Watson Harza (MWH)
Type: Plan
Description:Plan of new dam layout with topographic map of Sterling Pond area.
Topographic map provided by Christopher B.Burke Engineering, LTD. (2002).
Extent: 1 Sheet
Sterling Pond Bridge Replacement (3.47243)
Date: August 8 2002Creator: Christopher B. Burke, Engineering West, Ltd.
Type: Plan
Description:Plans and topographical surveys for the Sterling Pond bridge replacement in 2002.
"Issued for Permit"
"Project No. 02-273"
Each page is stamped and signed by the DuPage County Dept. of Development & Stormwater, Stormwater Management Division. (Oct 07 2002)
Index:
S-1 Site plan and general notes
S-2 Existing bridge plan and details
S-3 Pre-Engineered bridge plan and details
Appendix A1 For information purposes only
Appendix A2 For information purposes only
Appendix A3 For information purposes only
Copy 2 lacks the certification stamps.
Extent: 7 Sheets
Sterling Pond Bridge Replacement (3.47244)
Creator: Christopher B. Burke, Engineering West, Ltd.
Type: Plan
Description:Plans and topographical surveys for the Sterling Pond bridge replacement in 2002.
"Issued for Permit"
"Project No. 02-273"
Index:
S-1 Site plan and general notes
S-2 Existing bridge plan and details
S-3 Pre-Engineered bridge plan and details
Appendix A1 For information purposes only
Appendix A2 For information purposes only
Appendix A3 For information purposes only
Extent: 7 Sheets
Sterling Pond Bridge Replacement (3.47245)
Date: July 23 2002Creator: Christopher B. Burke, Engineering West, Ltd.
Type: Plan
Description:Plans and topographical surveys for the Sterling Pond bridge replacement in 2002.
"Issued for Bid"
"Project No. 02-273"
Index:
S-1 Site plan and general notes
S-2 Existing bridge plan and details
S-3 Pre-Engineered bridge plan and details
Appendix A1 For information purposes only
Appendix A2 For information purposes only
Appendix A3 For information purposes only
Extent: 7 Sheets
House for Mrs. Suzette Morton Zurcher, Lisle, Illinois [contract set] (3.5507)
Date: March 1962Creator: Arthur Myhrum & Edward H. Bennett, Jr.
Type: Plan
Description:Residence constructed in the Sterling Pond area on a parcel of land originally within the Slusser Farm. Includes revisions made in April and May 1962.
Extent: 10 sheets
Caretaker's House for Mrs. Morton Zurcher, Lisle, Illinois [revision] (3.5508)
Date: March 1962Creator: Myhrum, Arthur
Type: Plan
Description:Structure constructed in the Sterling Pond area on a parcel of land originally within the Slusser farm.
Includes revisions and an extra sheet showing a roof plan that was drawn December 20, 1971.
Extent: 4 sheets in binder
General Specifications, House for Mrs. Suzette M. Zurcher, Lisle, Illinois (3.5509)
Date: March 1962Type: Plan
Description:General specifications. [March] 1962.
Extent: 24 sheets
Morton Arboretum, Round Meadow Lane Bridge Replacement (3.5598)
Date: May 1988Creator: Tyznik, Anthony, Ciorba Group, Inc.
Type: Plan
Description:Sheet 7 prepared by Anthony Tyznik and titled: A Bridge Railing Detail for The Morton Arboretum.
Extent: 7 sheets in binder
A Construction Plan for the Sterling Pond Bridge, The Morton Arboretum, Lisle, Illinois (3.5602)
Date: circa 1970Creator: Tyznik, Anthony
Type: Plan
Description:Bridge not constructed according to this plan.
Extent: 1 sheet
A construction plan for the Sterling Pond bridge, the Morton Arboretum, Lisle, Illinois Illinois (3.5603)
Date: circa 1970Creator: Tyznik, Anthony
Type: Plan
Description:Bridge not constructed according to this plan.
Extent: 1 sheet
New Garage for Mr. and Mrs. E. Davidson, Lisle, Illinois (3.6179)
Date: July 1 1971Creator: Myhrum, Arthur
Type: Plan
Extent: 1 sheet
House for Mrs. Suzette Morton Davidson, Lisle, Illinois [1970 revision] (3.6180)
Date: November 15 1970Creator: Myhrum, Arthur
Type: Plan
Description:Revision of page 1 of Accession number 277 (3.5507), dated November 15, 1970.
Extent: 1 sheet
House for Mrs. Suzette Morton Zurcher, Lisle, Illinois (3.6182)
Date: March 1962Creator: Arthur Myhrum & Edward H. Bennett, Jr.
Type: Plan
Description:Residence constructed in the Sterling Pond area on a parcel of land originally within the Slusser Farm.
Extent: 6 sheets
[Sterling Pond Bridge Modifications] (3.6305)
Type: Plan
Description:Note on back: "CEG Bridge." Side elevation.
Extent: 1 sheet
Morton Arboretum, Round Meadow Lane Bridge Replacement (3.6357)
Date: May 1988Creator: Ciorba Group, Inc.
Type: Plan
Description:Copy 2 marked "Final," and inclues spiral bound "Contract Documents."
Extent: 6 sheets in binder
Caretaker's house for Mrs. Morton Zurcher, Lisle, Illinois (3.6819)
Date: March 1962Creator: Arthur Myhrum & Edward H. Bennett, Jr.
Type: Plan
Description:Structure constructed in the Sterling Pond area on a parcel of land originally within the Slusser farm.
Extent: 3 sheets
Vehicular Bridge 14' x 26' [Sterling Pond] (3.7083)
Date: August 9 2002Creator: Steadfast Bridges
Type: Plan
Description:Built 2002
Stamped "Field Use."
Extent: 3 sheets
Sterling Pond Bridge Replacement (3.7104)
Date: October 28 2002Creator: Christopher B. Burke, Engineering West, Ltd.
Type: Plan
Description:As-built. Includes May 17, 2002 Steadfast Bridges plan (three sheets). See STRU:L II (d) 2 for Steadfast Bridges plan (three sheets).
Extent: 7 sheets stapled