Browsing by Subject/Keyword: has image:
Dutch country scene / Chas. P. Gruppe. (3.30241)
Date: 1898Creator: Gruppe, Charles Paul, 1860-1940.
Type: Painting
Extent: 1 painting : watercolor, visible image 43 x 64 cm.
Lighting Layout (3.31999)
Date: November 5 2004Creator: Pelkonen, Peggy
Type: Plan
Description:Sheet 1 of 4: Bridge, Entry Road, Meadow Lake, Parking Lot 1
Sheet 2 of 4: Arbor Court, Dining Deck, Meadow Lake, Visitor Center, Forecourt, Parking Lot 1, Staff Lot, Administration Building Walk, Research Lot
Sheet 3 of 4: I-88 sign, South Farm, Research lot
Sheet 4 of 4: Entry Road, Parking Lot 1, Meadow Lake, Arbor Court, Dining Deck, Visitor Center, Forecourt
Extent: 4 sheets
[Retaining Wall Elevations] (3.32016)
Date: November 24 2004Type: Plan
Description:Elevations of retaining wall, likely related to the I-88 retaining wall/noise wall locations as seen on STRU:A-III(f)7 (3.32018).
Extent: 1 sheet
[Retaining Wall, I-88 Parapet Over Route 53] (3.32017)
Type: Plan
Description:One sheet with eight elevations of I-88 parapet over Route 53, with retaining wall, abutments, and wing walls.
Extent: 1 sheet
I-88 (Ronald Reagan Tollway) Retaining Wall / Noise Wall Locations (3.32018)
Date: November 2004Creator: Bowman, Barrett & Associates, Inc.
Type: Plan
Description:Two sheets showing I-88 from west of Yackley east to Finley; one sticky note attached on sheet one: "North wall 1050 lf/ South wall 680 lf/Bridge 260 lf/800 lf wall South side of 88 (E. bound)"
Extent: 2 sheets
The Morton Arboretum Entrance Bridge (3.32050)
Date: May 12 2003Creator: Christopher B. Burke, Engineering West, Ltd.
Type: Plan
Description:35 page stapled booklet; new Arboretum entrance from Route 53.
Extent: 35 sheets
Lighting Layout (3.40163)
Date: September 14 2005Creator: Pelkonen, Peggy
Type: Plan
Description:Sheet 1 of 5 (as well as additional sheet 1 with match line): Bridge, Entry Road, Meadow Lake, Parking Lot 1
Sheet 2 of 5 (as well as additional sheet 2 with match line): Entry Road, Parking Lot 1, Meadow Lake, Forecourt, Staff Parking Lot, Route 53, Research Parking Lot, Administration Building Walk, Visitor Center, Retail Garden, Children's Garden, Arbor Court, Dining Deck
Sheet 3 of 5 (as well as additional sheet 3 with match line): I-88, Research Parking Lot, South Farm, Administration Building Walk
Sheet 4 of 5: Entry Road, Parking Lot 1, Meadow Lake, Arbor Court, Dining Deck, Visitor Center, Forecourt, Retail Garden
Sheet 5 of 5: N/A
Extent: 7 sheets
Sterling Pond Bridge Replacement (3.47243)
Date: August 8 2002Creator: Christopher B. Burke, Engineering West, Ltd.
Type: Plan
Description:Plans and topographical surveys for the Sterling Pond bridge replacement in 2002.
"Issued for Permit"
"Project No. 02-273"
Each page is stamped and signed by the DuPage County Dept. of Development & Stormwater, Stormwater Management Division. (Oct 07 2002)
Index:
S-1 Site plan and general notes
S-2 Existing bridge plan and details
S-3 Pre-Engineered bridge plan and details
Appendix A1 For information purposes only
Appendix A2 For information purposes only
Appendix A3 For information purposes only
Copy 2 lacks the certification stamps.
Extent: 7 Sheets
Sterling Pond Bridge Replacement (3.47244)
Creator: Christopher B. Burke, Engineering West, Ltd.
Type: Plan
Description:Plans and topographical surveys for the Sterling Pond bridge replacement in 2002.
"Issued for Permit"
"Project No. 02-273"
Index:
S-1 Site plan and general notes
S-2 Existing bridge plan and details
S-3 Pre-Engineered bridge plan and details
Appendix A1 For information purposes only
Appendix A2 For information purposes only
Appendix A3 For information purposes only
Extent: 7 Sheets
Sterling Pond Bridge Replacement (3.47245)
Date: July 23 2002Creator: Christopher B. Burke, Engineering West, Ltd.
Type: Plan
Description:Plans and topographical surveys for the Sterling Pond bridge replacement in 2002.
"Issued for Bid"
"Project No. 02-273"
Index:
S-1 Site plan and general notes
S-2 Existing bridge plan and details
S-3 Pre-Engineered bridge plan and details
Appendix A1 For information purposes only
Appendix A2 For information purposes only
Appendix A3 For information purposes only
Extent: 7 Sheets
Morton Arboretum, Round Meadow Lane Bridge Replacement (3.5598)
Date: May 1988Creator: Tyznik, Anthony, Ciorba Group, Inc.
Type: Plan
Description:Sheet 7 prepared by Anthony Tyznik and titled: A Bridge Railing Detail for The Morton Arboretum.
Extent: 7 sheets in binder
A Construction Plan for the Sterling Pond Bridge, The Morton Arboretum, Lisle, Illinois (3.5602)
Date: circa 1970Creator: Tyznik, Anthony
Type: Plan
Description:Bridge not constructed according to this plan.
Extent: 1 sheet
A construction plan for the Sterling Pond bridge, the Morton Arboretum, Lisle, Illinois Illinois (3.5603)
Date: circa 1970Creator: Tyznik, Anthony
Type: Plan
Description:Bridge not constructed according to this plan.
Extent: 1 sheet
Morton Arboretum Bridge Plan [Over the East Branch of the DuPage River] Section & Elevation (3.5604)
Creator: George W. Barton and Associates
Type: Plan
Extent: 3 sheets in binder
[Planting Plan Along Simonds Road at the DuPage River Bridge] (3.5686)
Date: 1920sCreator: Teuscher, Henry
Type: Plan
Description:Plan shows Joy Morton's initialed approval.
Extent: 1 sheet
North-South Tollway bridge sketches [by] Envirodyne Engineers (3.5867)
Date: March 1 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:Cover title. "Appendix C". The vol. is stamped "Preliminary".
Extent: 1 volume (var paging)
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5874)
Date: February 9 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v. 5, Warrenville Road bridge
Extent: 1 of 5 volumes
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5876)
Date: February 24 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:[Contract requirements] North-South Tollway roadway and bridge construction, M.P. 20.70 to M.P. 22.28, Sta. 1190 to Sta. 1260.
Extent: 1 volume
A Foot Bridge for the East Branch of the DuPage River (3.6184)
Creator: Tyznik, Anthony
Type: Plan
Description:Plan view, side elevation, end elevation, construction drawings.
Extent: 1 sheet
A Bridge Railing Detail for the Morton Arboretum (3.6185)
Date: 1988Creator: Tyznik, Anthony
Type: Plan
Description:Plan view, south elevation, end section, post bracket detail construction drawings [Lake Marmo]
Extent: 1 sheet
A Construction Plan for an Insectory Bridge, The Morton Arboretum (3.6186)
Creator: Tyznik, Anthony
Type: Plan
Description:Plan, side elevation, and end section construction drawings.
Extent: 1 sheet
A Construction Drawing for the Ozark's Bridge, The Morton Arboretum (3.6187)
Creator: Tyznik, Anthony
Type: Plan
Description:Plan, elevation, end section drawings.
Extent: 1 sheet
A Construction Drawing for the Thornhill Trail Bridge, The Morton Arboretum (3.6188)
Creator: Tyznik, Anthony
Type: Plan
Description:Side elevation, plan view, end elevation construction drawings.
Extent: 1 sheet
A Construction Drawing for a Bridge for the South End of the Ozarks Collection (3.6189)
Creator: Tyznik, Anthony
Type: Plan
Description:Plan, side elevation, end elevation construction drawings.
Extent: 1 sheet
A Construction Drawing for the Willow Collection Bridge, The Morton Arboretum (3.6190)
Creator: Tyznik, Anthony
Type: Plan
Description:Plan view, side elevation, end elevation construction drawings.
Extent: 1 sheet
A Construction Plan for the Japanese Island Bridge, The Morton Arboretum (3.6191)
Creator: Tyznik, Anthony
Type: Plan
Description:Side elevation, plan, end section construction drawings.
Extent: 1 sheet
A Construction Plan for a Ravine Trail Bridge, The Morton Arboretum (3.6193)
Creator: Tyznik, Anthony
Type: Plan
Description:Plan, side elevation, end elevation construction drawings. A draft on vellum exists at #1640 (3.6855).
Extent: 1 sheet
A Plan for a Foot Bridge for the Appalachian Collection, The Morton Arboretum (3.6264)
Creator: Tyznik, Anthony
Type: Plan
Description:Plan view, side and end elevations.
Extent: 1 sheet
[Marmo Bridge] (3.6265)
Creator: Tyznik, Anthony
Type: Plan
Description:Plan and elevation. Note on back: "Marmo Bridge."
Extent: 1 sheet
[Ozark Bridge] (3.6266)
Date: 1964Type: Plan
Description:Note on back: "Ozark Bride [sic], 1964"
Extent: 2 sheets
Proposed Bridge Railing Modifications for Existing Bridge over East Branch of the DuPage River at the Morton Arboretum [Near Arbor Lake] (3.6284)
Date: August 14 1996Creator: Mehaffey, Scott A.
Type: Plan
Description:"Not for construction - estimates only" written on plan.
Extent: 1 sheet
[Sterling Pond Bridge Modifications] (3.6305)
Type: Plan
Description:Note on back: "CEG Bridge." Side elevation.
Extent: 1 sheet
Morton Arboretum, Round Meadow Lane Bridge Replacement (3.6357)
Date: May 1988Creator: Ciorba Group, Inc.
Type: Plan
Description:Copy 2 marked "Final," and inclues spiral bound "Contract Documents."
Extent: 6 sheets in binder
Sketch for Proposed Bridge, Morton Arboretum (3.6359)
Date: circa 1921Creator: O. C. Simonds & Co.
Type: Plan
Description:Sketch has been repaired and placed in cardboard/clear plastic envelope. Includes plan, section and elevation. (Lake Marmo dam bridge)
Extent: 1 sheet
Bridge for Morton Arboretum (3.6372)
Date: August 22 1921Creator: O. C. Simonds & Co.
Type: Plan
Description:Plan (damaged) for Lake Marmo dam and bridge.
Extent: 1 sheet
[Proposed Foot/Bike Bridge and Ramp Across Route 53 North of Park Blvd.] (3.6490)
Creator: Tyznik, Anthony
Type: Plan
Description:Proposed idea for bike trail across Route 53 and Park Blvd. (highlighted in color pencil).
Extent: 1 sheet