Berm Landscape Plan - West Section and East Section [11/1992, additional handwritten notes] (3.32004)
Date: November 17 – 19 1992Creator: Tyznik, Anthony
Type: Plan
Description:West section is on sheets 1 and 2, east section on sheets 3-6.
Handwritten plant changes on plan.
Extent: 6 sheets bound and stapled
Plat of Survey, North-South Tollway, Parcel NS-06-002.1 (3.5404)
Date: May 12 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:"Property shown… in Section 1, Township 38 north, range 10 east of the third principal meridian, DuPage County, Illinois."
Extent: 1 sheet
Water Table Potential of Soils Along the North-South Tollway Corridor at The Morton Arboretum (3.5450)
Date: April 1985Creator: Hootman, Rick
Type: Map
Extent: 1 sheet
Proposed FT "A" [telephone] cable relocation. Preliminary (3.5843)
Date: April 24 1986Creator: AT&T Communications, Inc.
Type: Map
Description:Telephone cable relocation along the North-South Tollway on the southern and eastern boundaries of the Arboretum.
Extent: 2 sheets stapled
F. A. Route 61 (Ill. Route 53 expressway): Will County Section 99-1 & 99-2; Cook County Section 16-1; DuPage County Section 22-1 (3.5845)
Date: 1963Creator: A. Benesch & Co.
Type: Map
Description:"Key plan" An early proposal for the North-South Tollway.
Extent: 1 sheet
Intersection design study: F. A. P. route 431 (Ill. Rte. 53 freeway) with U.S. Route 34 (Ogden Ave.) Sec. no. 22-2, DuPage County. Preliminary. (3.5846)
Date: circa 1965Creator: Tornrose, Campbell, & Assoc.
Type: Map
Description:"Preliminary print, Illinois Division of Highways, Mobility Studies Unit, subject to revisions" stamped on map. An early proposal for the North-South Tollway.
Extent: 1 sheet
Proposed route of FA-61 across the Morton Arboretum east side (3.5847)
Date: March 1972Creator: Coulter, Ronald M.
Type: Map
Extent: 1 sheet
Proposed route of FA-61 across the Morton Arboretum east side (3.5848)
Date: March 1972Creator: Coulter, Ronald M.
Type: Map
Extent: 1 sheet
FAP Route 431 [North-South Tollway] Exhibit 1 [-5] (3.5851)
Date: circa October 1983Type: Map
Description:A composite work assembled as follows: Exhibit 1, issued by Schacht, Johnson, Associates, Inc., Chicago, has title F.A.P. 431, Highway 53 relocation…. 90x114 cm. Line drawing and verticle cross-section of the proposed roadway. Exhibits 2-5 are reproductions of the Sidwell Company, West Chicago aerial survey issued in Jan., 1977, with added ink line drawings indentifying land tracts and utility rights-of-way. (84x84 cm.). Title shown above is taken from labels mounted on each of the sheets.
Extent: 5 sheets stapled
[Aerial survey of the proposed F.A.P. 431 ( North-South Tollway) road plan along the Morton Arboretum] (3.5852)
Date: circa 1983Type: Map
Description:Roadway added as line-drawing overlay to aerial survey.
Extent: 1 sheet
F. A. P. Route 431 [North-South Tollway] proposed typical sections (3.5853)
Date: 1983Creator: McDonough Associates, Inc.
Type: Map
Description:A composite work consisting of road cross-sections (scale: horizontal, 1 inch = 20 feet and vertical, 1 inch = 10 feet) identified as C-C , D-D, E-E, F-F, G-G, and H-H. Specific cross-sectional locations are then shown on an accompanying aerial survey. (scale: 1 inch = 100 feet; 95x90 cm.) .
Extent: 6 sheets stapled
The Morton Arboretum, east side [woody plants collections, showing preliminary configuration of the North-South Tollway and the existing East-West tollway] (3.5854)
Date: 1984Creator: Hart, Nancy
Type: Map
Description:Map shows areas where salt and noise pollution is anticipated.
Extent: 1 sheet with overlay in portfolio
The Morton Arboretum, east side [woody plants collections, showing preliminary configuration of the North-South Tollway and the existing East-West tollway] (3.5855)
Date: 1984Creator: Hart, Nancy
Type: Map
Description:Map shows areas where salt and noise pollution is anticipated.
Extent: 1 sheet mounted on posterboard
The Morton Arboretum, east side [woody plants collections, showing preliminary configuration of the North-South Tollway and the existing East-West tollway] (3.5856)
Date: 1984Creator: Hart, Nancy
Type: Map
Description:Map shows areas where salt and noise pollution is anticipated.
Extent: 1 sheet
North-South Tollway drainage plan, Contract CIP-615, McDonough Associates, Inc. (3.5857)
Creator: Illinois State Toll Highway Authority
Type: Map
Description:Sheets numbered DR-5--DR-7 and DR-14--DR-16. Shown in these drawings are the roadway plans for the North-South Tollway between Sta. 1152-1195 and Sta. 7558+30-7600+50; adjacent portions of the East-West Tollway are also included. The roadways are located along the south boundary of the Arboretum.
Extent: 6 sheets stapled
North-South Tollway [engineering drawings] Contract D6, McDonough Associates, Inc. (3.5858)
Creator: Illinois State Toll Highway Authority
Type: Map
Description:Sheets numbered 44-46, 51-54, 66-68, and 73. CONTENTS:--Roadway plans Sta. 1152-1195 and Sta. 7529-7585+50. --Roadway profiles Sta. 1155-2000.--Ramp NW profile Sta. 58-73+30.
Extent: 11 sheets stapled
North-South Tollway--East-West Tollway interchange. [Contractor] Envirodyne Engineers, Inc. (3.5859)
Date: May 1985Creator: Illinois State Toll Highway Authority
Type: Map
Description:Drawings include roadway plans, sheets 1-3 and roadway profile drawings, sheets 4-12.
Extent: 12 sheets stapled
North-South Tollway preliminary alignment (Ogden Avenue-Butterfield Road. Contractor) Envirodyne Engineers, Inc. (3.5860)
Date: February 21 1985Creator: Illinois State Toll Highway Authority
Type: Map
Description:Aerial survey with the preliminary alignment of the North-South Tollway with the East-West Tollway drawn in.
Extent: 2 sheets stapled
North-South Tollway preliminary plans [by] Envirodyne Engineers. Aerial photography by Aero-metric Engineering, Inc., photogrammetric engineers. (3.5861)
Date: March 1 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:Sheets numbered: "Drawing 1[-12] of 12," aerial photographs on which the roadway has been drawn in. Sheets 3, 5, 7, 9, and 11 are accompanied by roadway profiles numbered 3a, 5a, 7a, 9a, and 11a. Cover title. "Appendix A". Aerial survey made in November 1984.
Extent: 18 sheets
[Topographic map of the southern boundary area of the Arboretum showing the North-South Tollway right-of-way] (3.5862)
Date: October 1985Creator: Illinois State Toll Highway Authority
Type: Map
Extent: 10 sheets stapled
Morton Arboretum berm, plan and profile, Sta. 1157 to Sta. 1193. [Contractor] Vollmer Associates, consulting engineers (3.5863)
Date: May 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:A preliminary proposal. For the topographic configuration of the berm actually developed see Tyznik, Anthony. A berm detail… (SURV:A III (c) 1).
Extent: 4 sheets stapled
North-South Tollway plan: Section D-7a, Sta. 1180 to Sta. 1260 [by] PRC Consoer Townsend, design section engineer (3.5864)
Date: June 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:Sheets are stamped: "Preliminary plans, subject to revision".
Extent: 7 sheets stapled
Existing and proposed watersheds, North-South Tollway plan (3.5865)
Date: March 1 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:The principal title above appears in ms. added to drawing 6 in the State Toll Highway Authority's aerial survey on which the plan for the North-South Tollway was drawn in (See BOUND:C III (c) 1). Watershed features are also drawn in in this work which appears in 3 sheets labelled in ms.: drawing no. 88-89, and 91.
Extent: 3 sheets stapled
North-South Tollway interchange sketches [by] Envirodyne Engineers (3.5866)
Date: March 1 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:Cover title. "Appendix B".
Extent: 1 volume (var paging)
North-South Tollway bridge sketches [by] Envirodyne Engineers (3.5867)
Date: March 1 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:Cover title. "Appendix C". The vol. is stamped "Preliminary".
Extent: 1 volume (var paging)
North-South Tollway exhibits [by] Envirodyne Engineers (3.5868)
Date: March 1 1986Creator: Illinois State Toll Highway Authority
Type: Map
Extent: 1 volume (var paging)
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5869)
Date: February 9 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v.1, Roadway
Extent: 1 of 5 volumes
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5870)
Date: February 24 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:Contract requirements for Contract CIP-615, North-South Tollway roadway, bridge, tunnel, and ramp toll plaza construction.
Extent: 1 volume
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5871)
Date: February 9 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v. 2, Specialties and standard drawings
Extent: 1 of 5 volumes
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5872)
Date: February 9 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v.3, Cross-sections
Extent: 1 of 5 volumes
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5873)
Date: February 9 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v.4, Structures
Extent: 1 of 5 volumes
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5874)
Date: February 9 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v. 5, Warrenville Road bridge
Extent: 1 of 5 volumes
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5875)
Date: February 12 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.1, Roadway plans
Extent: 1 of 5 volumes
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5876)
Date: February 24 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:[Contract requirements] North-South Tollway roadway and bridge construction, M.P. 20.70 to M.P. 22.28, Sta. 1190 to Sta. 1260.
Extent: 1 volume
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5877)
Date: February 12 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.2, Cross-sections
Extent: 1 of 5 volumes