[Topographic map of the southern boundary area of the Arboretum showing the North-South Tollway right-of-way] (3.5862)
Date: October 1985Creator: Illinois State Toll Highway Authority
Type: Map
Extent: 10 sheets stapled
[North-South Tollway early proposal, including Ogden Ave. interchange, route along Arboretum east and south boundaries] (3.6780)
Date: circa 1965Type: Map
Description:Stamped "Preliminary" Note on back: "Alternate Rte. 53" "Rte. 53 New"
Extent: 1 sheet
[Aerial survey of the proposed F.A.P. 431 ( North-South Tollway) road plan along the Morton Arboretum] (3.5852)
Date: circa 1983Type: Map
Description:Roadway added as line-drawing overlay to aerial survey.
Extent: 1 sheet
Water Table Potential of Soils Along the North-South Tollway Corridor at The Morton Arboretum (3.5450)
Date: April 1985Creator: Hootman, Rick
Type: Map
Extent: 1 sheet
Urban Vegetation Laboratory Report V. 1 No. 1, 1988 (3.83045)
Date: March 21 – June 20 1988Type: Document
Description:In-house publication of the Morton Arboretum. This particular issue discusses the North-South Tollway, current grants, research, publications and objectives of the UVL.
Extent: 2 sheets, 1 folded
Urban Vegetation Laboratory Newsletter Volume 1, Number 1, Spring 1988 (3.67125)
Date: 1988Creator: Irving, Gary
Type: Document
Description:Text only content for a newsletter titled Urban Vegetation Laboratory Newsletter for the Morton Arboretum in Lisle, Illinois. The document also contains a history of the laboratory's objectives, facilities, and personnel.
Extent: 11 sheets
Tollway Right-of-Way and Easement at Morton Arboretum (3.6366)
Date: January 14 1988Creator: Illinois State Toll Highway Authority
Type: Map
Extent: 3 sheets
The Morton Arboretum, east side [woody plants collections, showing preliminary configuration of the North-South Tollway and the existing East-West tollway] (3.5856)
Date: 1984Creator: Hart, Nancy
Type: Map
Description:Map shows areas where salt and noise pollution is anticipated.
Extent: 1 sheet
The Morton Arboretum, east side [woody plants collections, showing preliminary configuration of the North-South Tollway and the existing East-West tollway] (3.5854)
Date: 1984Creator: Hart, Nancy
Type: Map
Description:Map shows areas where salt and noise pollution is anticipated.
Extent: 1 sheet with overlay in portfolio
The Morton Arboretum, east side [woody plants collections, showing preliminary configuration of the North-South Tollway and the existing East-West tollway] (3.5855)
Date: 1984Creator: Hart, Nancy
Type: Map
Description:Map shows areas where salt and noise pollution is anticipated.
Extent: 1 sheet mounted on posterboard
Stop the Tollway [Chicago Sun-Times editorial February 20,1984] (3.67075)
Date: February 20 1984Type: Document
Description:Chicago Sun-Times editorial dated February 20, 1984 calling for improvements to existing Illinois 53 versus construction of a new tollway.
Extent: 1 sheet
Proposed route of FA-61 across the Morton Arboretum east side (3.5847)
Date: March 1972Creator: Coulter, Ronald M.
Type: Map
Extent: 1 sheet
Proposed route of FA-61 across the Morton Arboretum east side (3.5848)
Date: March 1972Creator: Coulter, Ronald M.
Type: Map
Extent: 1 sheet
Proposed FT "A" [telephone] cable relocation. Preliminary (3.5843)
Date: April 24 1986Creator: AT&T Communications, Inc.
Type: Map
Description:Telephone cable relocation along the North-South Tollway on the southern and eastern boundaries of the Arboretum.
Extent: 2 sheets stapled
Preliminary Response to Category 4: Agreement between the Morton Arboretum and the Illinois Toll Highway Authority [draft] (3.67152)
Type: Document
Description:A draft document discussing the preliminary agreement between the Morton Arboretum and the Illinois Toll Highway Authority regarding concessions and environmental impacts of the Tollway on the Arboretum.
Extent: 3 sheets
Plat of Survey, North-South Tollway, Parcel NS-06-002.1 (3.5404)
Date: May 12 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:"Property shown… in Section 1, Township 38 north, range 10 east of the third principal meridian, DuPage County, Illinois."
Extent: 1 sheet
North-South Tollway--East-West Tollway interchange. [Contractor] Envirodyne Engineers, Inc. (3.5859)
Date: May 1985Creator: Illinois State Toll Highway Authority
Type: Map
Description:Drawings include roadway plans, sheets 1-3 and roadway profile drawings, sheets 4-12.
Extent: 12 sheets stapled
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5869)
Date: February 9 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v.1, Roadway
Extent: 1 of 5 volumes
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5870)
Date: February 24 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:Contract requirements for Contract CIP-615, North-South Tollway roadway, bridge, tunnel, and ramp toll plaza construction.
Extent: 1 volume
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5871)
Date: February 9 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v. 2, Specialties and standard drawings
Extent: 1 of 5 volumes
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5872)
Date: February 9 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v.3, Cross-sections
Extent: 1 of 5 volumes
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5873)
Date: February 9 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v.4, Structures
Extent: 1 of 5 volumes
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5874)
Date: February 9 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v. 5, Warrenville Road bridge
Extent: 1 of 5 volumes
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5878)
Date: February 12 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.3, Structures
Extent: 1 of 5 volumes
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5879)
Date: February 12 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.4, Structures: steel girder alternate
Extent: 1 of 5 volumes
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5880)
Date: February 12 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.5, Structures: concrete box alternate
Extent: 1 of 5 volumes
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5875)
Date: February 12 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.1, Roadway plans
Extent: 1 of 5 volumes
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5876)
Date: February 24 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:[Contract requirements] North-South Tollway roadway and bridge construction, M.P. 20.70 to M.P. 22.28, Sta. 1190 to Sta. 1260.
Extent: 1 volume
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5877)
Date: February 12 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.2, Cross-sections
Extent: 1 of 5 volumes
North-South Tollway preliminary plans [by] Envirodyne Engineers. Aerial photography by Aero-metric Engineering, Inc., photogrammetric engineers. (3.5861)
Date: March 1 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:Sheets numbered: "Drawing 1[-12] of 12," aerial photographs on which the roadway has been drawn in. Sheets 3, 5, 7, 9, and 11 are accompanied by roadway profiles numbered 3a, 5a, 7a, 9a, and 11a. Cover title. "Appendix A". Aerial survey made in November 1984.
Extent: 18 sheets
North-South Tollway preliminary alignment (Ogden Avenue-Butterfield Road. Contractor) Envirodyne Engineers, Inc. (3.5860)
Date: February 21 1985Creator: Illinois State Toll Highway Authority
Type: Map
Description:Aerial survey with the preliminary alignment of the North-South Tollway with the East-West Tollway drawn in.
Extent: 2 sheets stapled
North-South Tollway plan: Section D-7a, Sta. 1180 to Sta. 1260 [by] PRC Consoer Townsend, design section engineer (3.5864)
Date: June 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:Sheets are stamped: "Preliminary plans, subject to revision".
Extent: 7 sheets stapled
North-South Tollway interchange sketches [by] Envirodyne Engineers (3.5866)
Date: March 1 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:Cover title. "Appendix B".
Extent: 1 volume (var paging)
North-South Tollway exhibits [by] Envirodyne Engineers (3.5868)
Date: March 1 1986Creator: Illinois State Toll Highway Authority
Type: Map
Extent: 1 volume (var paging)
North-South Tollway drainage plan, Contract CIP-615, McDonough Associates, Inc. (3.5857)
Creator: Illinois State Toll Highway Authority
Type: Map
Description:Sheets numbered DR-5--DR-7 and DR-14--DR-16. Shown in these drawings are the roadway plans for the North-South Tollway between Sta. 1152-1195 and Sta. 7558+30-7600+50; adjacent portions of the East-West Tollway are also included. The roadways are located along the south boundary of the Arboretum.
Extent: 6 sheets stapled