The Morton Arboretum, east side [woody plants collections, showing preliminary configuration of the North-South Tollway and the existing East-West tollway] (3.5855)
Date: 1984Creator: Hart, Nancy
Type: Map
Description:Map shows areas where salt and noise pollution is anticipated.
Extent: 1 sheet mounted on posterboard
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5871)
Date: February 9 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v. 2, Specialties and standard drawings
Extent: 1 of 5 volumes
A Landscape Development Plan for the Tollway Berm, West and East Sections, The Morton Arboretum [10/1992] (3.6529)
Date: October 1992Creator: Tyznik, Anthony
Type: Plan
Extent: 2 sheets
The Morton Arboretum, east side [woody plants collections, showing preliminary configuration of the North-South Tollway and the existing East-West tollway] (3.5856)
Date: 1984Creator: Hart, Nancy
Type: Map
Description:Map shows areas where salt and noise pollution is anticipated.
Extent: 1 sheet
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5872)
Date: February 9 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v.3, Cross-sections
Extent: 1 of 5 volumes
A Landscape Development Plan for the Tollway Berm, West and East Sections, The Morton Arboretum [10/1992, colored, including pencil modifications] (3.6530)
Date: October 1992Creator: Tyznik, Anthony
Type: Plan
Description:Partially colored with colored pencil and includes pencil corrections.
Extent: 2 sheets
North-South Tollway drainage plan, Contract CIP-615, McDonough Associates, Inc. (3.5857)
Creator: Illinois State Toll Highway Authority
Type: Map
Description:Sheets numbered DR-5--DR-7 and DR-14--DR-16. Shown in these drawings are the roadway plans for the North-South Tollway between Sta. 1152-1195 and Sta. 7558+30-7600+50; adjacent portions of the East-West Tollway are also included. The roadways are located along the south boundary of the Arboretum.
Extent: 6 sheets stapled
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5873)
Date: February 9 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v.4, Structures
Extent: 1 of 5 volumes
Berm Plan - West Section and East Section [11/1992] (3.6537)
Date: November 17 – 19 1992Creator: Tyznik, Anthony
Type: Plan
Description:West section is on sheets 1 and 2, east section on sheets 3-6.
Extent: 6 sheets
Berm Landscape Plan - West Section and East Section [11/1992, additional handwritten notes] (3.32004)
Date: November 17 – 19 1992Creator: Tyznik, Anthony
Type: Plan
Description:West section is on sheets 1 and 2, east section on sheets 3-6.
Handwritten plant changes on plan.
Extent: 6 sheets bound and stapled
North-South Tollway [engineering drawings] Contract D6, McDonough Associates, Inc. (3.5858)
Creator: Illinois State Toll Highway Authority
Type: Map
Description:Sheets numbered 44-46, 51-54, 66-68, and 73. CONTENTS:--Roadway plans Sta. 1152-1195 and Sta. 7529-7585+50. --Roadway profiles Sta. 1155-2000.--Ramp NW profile Sta. 58-73+30.
Extent: 11 sheets stapled
North-South Tollway, Ogden Avenue & East-West Tollway interchange, mile post 19.0 to mile post 20.7; Contract C. I. P. 615, McDonough Associates, Inc., design section engineer. (3.5874)
Date: February 9 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: v. 5, Warrenville Road bridge
Extent: 1 of 5 volumes
Berm Plan - West Section and East Section [03/1993, latest version] (3.6538)
Date: March 16 1993Creator: Tyznik, Anthony
Type: Plan
Description:West section is on sheets 1 and 2, east section on sheets 3-6.
Includes note: "copy with Bachtell's amendments, latest version March 16, 1993."
Missing sheet 6.
Extent: 5 sheets
North-South Tollway--East-West Tollway interchange. [Contractor] Envirodyne Engineers, Inc. (3.5859)
Date: May 1985Creator: Illinois State Toll Highway Authority
Type: Map
Description:Drawings include roadway plans, sheets 1-3 and roadway profile drawings, sheets 4-12.
Extent: 12 sheets stapled
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5875)
Date: February 12 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.1, Roadway plans
Extent: 1 of 5 volumes
Plat of Survey, North-South Tollway, Parcel NS-06-002.1 (3.5404)
Date: May 12 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:"Property shown… in Section 1, Township 38 north, range 10 east of the third principal meridian, DuPage County, Illinois."
Extent: 1 sheet
North-South Tollway preliminary alignment (Ogden Avenue-Butterfield Road. Contractor) Envirodyne Engineers, Inc. (3.5860)
Date: February 21 1985Creator: Illinois State Toll Highway Authority
Type: Map
Description:Aerial survey with the preliminary alignment of the North-South Tollway with the East-West Tollway drawn in.
Extent: 2 sheets stapled
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5876)
Date: February 24 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:[Contract requirements] North-South Tollway roadway and bridge construction, M.P. 20.70 to M.P. 22.28, Sta. 1190 to Sta. 1260.
Extent: 1 volume
Water Table Potential of Soils Along the North-South Tollway Corridor at The Morton Arboretum (3.5450)
Date: April 1985Creator: Hootman, Rick
Type: Map
Extent: 1 sheet
North-South Tollway preliminary plans [by] Envirodyne Engineers. Aerial photography by Aero-metric Engineering, Inc., photogrammetric engineers. (3.5861)
Date: March 1 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:Sheets numbered: "Drawing 1[-12] of 12," aerial photographs on which the roadway has been drawn in. Sheets 3, 5, 7, 9, and 11 are accompanied by roadway profiles numbered 3a, 5a, 7a, 9a, and 11a. Cover title. "Appendix A". Aerial survey made in November 1984.
Extent: 18 sheets
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5877)
Date: February 12 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.2, Cross-sections
Extent: 1 of 5 volumes
Proposed FT "A" [telephone] cable relocation. Preliminary (3.5843)
Date: April 24 1986Creator: AT&T Communications, Inc.
Type: Map
Description:Telephone cable relocation along the North-South Tollway on the southern and eastern boundaries of the Arboretum.
Extent: 2 sheets stapled
[Topographic map of the southern boundary area of the Arboretum showing the North-South Tollway right-of-way] (3.5862)
Date: October 1985Creator: Illinois State Toll Highway Authority
Type: Map
Extent: 10 sheets stapled
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5878)
Date: February 12 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.3, Structures
Extent: 1 of 5 volumes
F. A. Route 61 (Ill. Route 53 expressway): Will County Section 99-1 & 99-2; Cook County Section 16-1; DuPage County Section 22-1 (3.5845)
Date: 1963Creator: A. Benesch & Co.
Type: Map
Description:"Key plan" An early proposal for the North-South Tollway.
Extent: 1 sheet
Morton Arboretum berm, plan and profile, Sta. 1157 to Sta. 1193. [Contractor] Vollmer Associates, consulting engineers (3.5863)
Date: May 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:A preliminary proposal. For the topographic configuration of the berm actually developed see Tyznik, Anthony. A berm detail… (SURV:A III (c) 1).
Extent: 4 sheets stapled
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5879)
Date: February 12 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.4, Structures: steel girder alternate
Extent: 1 of 5 volumes
Intersection design study: F. A. P. route 431 (Ill. Rte. 53 freeway) with U.S. Route 34 (Ogden Ave.) Sec. no. 22-2, DuPage County. Preliminary. (3.5846)
Date: circa 1965Creator: Tornrose, Campbell, & Assoc.
Type: Map
Description:"Preliminary print, Illinois Division of Highways, Mobility Studies Unit, subject to revisions" stamped on map. An early proposal for the North-South Tollway.
Extent: 1 sheet
North-South Tollway plan: Section D-7a, Sta. 1180 to Sta. 1260 [by] PRC Consoer Townsend, design section engineer (3.5864)
Date: June 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:Sheets are stamped: "Preliminary plans, subject to revision".
Extent: 7 sheets stapled
North-South Tollway roadway plans, mile post 20.70 to mile post 22.28; Contract CIP-616, PRC Consoer Townsend … design section engineer (3.5880)
Date: February 12 1987Creator: Illinois State Toll Highway Authority
Type: Map
Description:CONTENTS: pt.5, Structures: concrete box alternate
Extent: 1 of 5 volumes
Proposed route of FA-61 across the Morton Arboretum east side (3.5847)
Date: March 1972Creator: Coulter, Ronald M.
Type: Map
Extent: 1 sheet
Existing and proposed watersheds, North-South Tollway plan (3.5865)
Date: March 1 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:The principal title above appears in ms. added to drawing 6 in the State Toll Highway Authority's aerial survey on which the plan for the North-South Tollway was drawn in (See BOUND:C III (c) 1). Watershed features are also drawn in in this work which appears in 3 sheets labelled in ms.: drawing no. 88-89, and 91.
Extent: 3 sheets stapled
Downers Grove Office Development, master plan: A development of Hamilton Partners - created by Wilson/Jenkins (3.6021)
Date: November 14 1988Creator: Wilson/Jenkins
Type: Plan
Description:Office development at the southwest corner of the intersection of the North-South Tollway (I-355) and Butterfield Road (Route 56).
Extent: 2 sheets stapled
Proposed route of FA-61 across the Morton Arboretum east side (3.5848)
Date: March 1972Creator: Coulter, Ronald M.
Type: Map
Extent: 1 sheet
North-South Tollway interchange sketches [by] Envirodyne Engineers (3.5866)
Date: March 1 1986Creator: Illinois State Toll Highway Authority
Type: Map
Description:Cover title. "Appendix B".
Extent: 1 volume (var paging)
North-South Tollway - tunnel modifications, Contract CIP615A, Centerline Station 1150+00 to Station 1165 = 00, NW Ramp Station 57 + 50 to Station 63 + 50 (3.6288)
Date: circa 1993Creator: Illinois State Toll Highway Authority
Type: Map
Description:Tunnel located where North-South and East-West Tollways intersect. A few red pencil corrections.
Extent: 14 sheets stapled