Landscape Features of The Morton Arboretum (3.11007)
Date: September 21 – December 20 1990Creator: Hootman, Rick, Kelsey, Pat
Type: Article
Looking south across Sterling Pond from Cricket Hill. Road on right becomes Evergreen Drive. (3.2980)
Date: circa 1960 – 1979Creator: Helmick, William K.
Type: Photographic image
Description:Looking south across Sterling Pond from Cricket Hill. Road on right becomes Evergreen Drive.
Extent: 1 photograph
Looking south over Sterling Pond in winter (3.31779)
Date: February 1970Type: Photographic image
Description:Looking south over Sterling Pond in winter
Extent: 1 negative
View of Sterling Pond looking north from Clarence Godshalk's yard in winter (3.31809)
Date: 1960sType: Photographic image
Description:View of Sterling Pond looking north from Clarence Godshalk's yard in winter. Open area across Sterling Pond used to be a gravel pit before 1959 when pond was dug.
Extent: 1 negative filmstrip
Sterling Pond looking north through bare trees from Clarence Godshalk's yard (3.31810)
Date: 1960sType: Photographic image
Description:Sterling Pond looking north through bare trees from Clarence Godshalk's yard. Open area across Sterling Pond used to be a gravel pit before 1959 when pond was dug.
Extent: 1 negative filmstrip
Pond west of Sterling Pond Bridge over inlet in winter (3.31811)
Date: 1960sType: Photographic image
Description:Pond west of Sterling Pond Bridge over inlet in winter
Extent: 1 negative filmstrip
Sterling Pond looking north from Clarence Godshalk's yard (3.31812)
Date: 1960sType: Photographic image
Description:Sterling Pond looking north from Director Clarence Godshalk's yard. Open area across Sterling Pond used to be a gravel pit before 1959 when pond was dug.
Extent: 1 negative filmstrip
Sterling Pond looking north (3.31813)
Date: 1960sType: Photographic image
Description:Sterling Pond looking north
Extent: 1 negative filmstrip
Tony Tyznik: Evolution of the Arboretum Landscape - Today and Tomorrow (3.32239)
Date: February 1 1978Type: Audio
Extent: 2 compact discs
Sterling Pond Dam Reconstruction: Alternative New Dam Layout and Grading Plan (3.47218)
Date: July 2002Creator: Montgomery Watson Harza (MWH)
Type: Plan
Description:Plan of new dam layout with topographic map of Sterling Pond area.
Topographic map provided by Christopher B.Burke Engineering, LTD. (2002)
Extent: 1 Sheet
Sterling Pond Dam Reconstruction: Alternative New Dam Layout and Grading Plan (3.47219)
Date: April 2002Creator: Montgomery Watson Harza (MWH)
Type: Plan
Description:Plan of new dam layout with topographic map of Sterling Pond area.
Topographic map provided by Christopher B.Burke Engineering, LTD. (2002).
Handwritten numbers and equations.
Extent: 1 Sheet
Sterling Pond Dam Reconstruction: New Dam Layout and Grading Plan (3.47220)
Date: April 2002Creator: Montgomery Watson Harza (MWH)
Type: Plan
Description:Plan of new dam layout with topographic map of Sterling Pond area.
Topographic map provided by Christopher B.Burke Engineering, LTD. (2002).
Extent: 1 Sheet
Sterling Pond Bridge Replacement (3.47243)
Date: August 8 2002Creator: Christopher B. Burke, Engineering West, Ltd.
Type: Plan
Description:Plans and topographical surveys for the Sterling Pond bridge replacement in 2002.
"Issued for Permit"
"Project No. 02-273"
Each page is stamped and signed by the DuPage County Dept. of Development & Stormwater, Stormwater Management Division. (Oct 07 2002)
Index:
S-1 Site plan and general notes
S-2 Existing bridge plan and details
S-3 Pre-Engineered bridge plan and details
Appendix A1 For information purposes only
Appendix A2 For information purposes only
Appendix A3 For information purposes only
Copy 2 lacks the certification stamps.
Extent: 7 Sheets
Sterling Pond Bridge Replacement (3.47244)
Creator: Christopher B. Burke, Engineering West, Ltd.
Type: Plan
Description:Plans and topographical surveys for the Sterling Pond bridge replacement in 2002.
"Issued for Permit"
"Project No. 02-273"
Index:
S-1 Site plan and general notes
S-2 Existing bridge plan and details
S-3 Pre-Engineered bridge plan and details
Appendix A1 For information purposes only
Appendix A2 For information purposes only
Appendix A3 For information purposes only
Extent: 7 Sheets
Sterling Pond Bridge Replacement (3.47245)
Date: July 23 2002Creator: Christopher B. Burke, Engineering West, Ltd.
Type: Plan
Description:Plans and topographical surveys for the Sterling Pond bridge replacement in 2002.
"Issued for Bid"
"Project No. 02-273"
Index:
S-1 Site plan and general notes
S-2 Existing bridge plan and details
S-3 Pre-Engineered bridge plan and details
Appendix A1 For information purposes only
Appendix A2 For information purposes only
Appendix A3 For information purposes only
Extent: 7 Sheets
A Construction Plan for the Sterling Pond Bridge, The Morton Arboretum, Lisle, Illinois (3.5602)
Date: circa 1970Creator: Tyznik, Anthony
Type: Plan
Description:Bridge not constructed according to this plan.
Extent: 1 sheet
A construction plan for the Sterling Pond bridge, the Morton Arboretum, Lisle, Illinois Illinois (3.5603)
Date: circa 1970Creator: Tyznik, Anthony
Type: Plan
Description:Bridge not constructed according to this plan.
Extent: 1 sheet
Data: Sterling (3.57611)
Date: May 15 1998Creator: Kelsey, Pat
Type: Dataset
Description:Data for Clean Lakes Program from Sterling Pond. Lists total depth, secchi, D.O., Temp. pH phenothaline alk., total alk., and light profile.
Seasons: November/December 1999 (3.62279)
Date: 1999Type: Serial
Seasons: July/August 2001 (3.62289)
Date: 2001Type: Serial
Seasons: January/February 2003 (3.62298)
Date: 2003Type: Serial
Fall Color Report, October 20-27, 2016 (3.62382)
Date: October 2016Creator: The Morton Arboretum
Type: Video
Description:Where fall color has been reported at The Morton Arboretum for October 20-27, 2016
Fall Color Report, October 27-November 3, 2016 (3.62383)
Date: 2016Creator: The Morton Arboretum
Type: Video
Description:Where fall color has been reported at The Morton Arboretum for October 27-November 3, 2016
Sterling Pond Bridge Replacement (3.7104)
Date: October 28 2002Creator: Christopher B. Burke, Engineering West, Ltd.
Type: Plan
Description:As-built. Includes May 17, 2002 Steadfast Bridges plan (three sheets). See STRU:L II (d) 2 for Steadfast Bridges plan (three sheets).
Extent: 7 sheets stapled
Sterling Pond Phytoplankton and Metabolism: The Effects of Stormwater Flushing (3.83043)
Date: May 1978Creator: Rust, William
Type: Document
Description:Research paper that discusses the effect of stormwater flushing on phytoplankton and metabolism of Sterling Pond located within the Sterling Morton Arboretum.
Extent: 12 sheets